国产国语刺激对白毛片黄色|无码激情AV一区二区三区|91久久这个有精品|久久久久久精品免费

<b id="isent"><s id="isent"></s></b>

<b id="isent"></b>

A good start to the new year! Another bid for Ningbo Rail Transit City Line Project

Time : 2023-01-05

At the beginning of the new year, Longyuan Construction Group welcomed the bid"A good start": the joint venture between the company and Sinohydro Bureau 11 Co., Ltd. is the Ningbo to Cixi (suburban) railway projectSGCX0threeThe bid winner of the bid section construction project, and the bid winning amountten point five twoRMBten0mn This is Longyuan Construction Grouptwo thousand and twenty-twoAt the end of the year, we won the bid for Ningxiang RailwaySGXS01After the construction of the bid section, it will be "the next city" on the Ningbo rail transit city line project.

Ningbo - Cixi City (Suburb) Railway"Ningci Line"), as Ningbo Rail TransittenLine 1, as the north wing skeleton line of Ningbo rail transit network, undertakes the medium and long distance travel from the central urban area of Ningbo to the northern sub-city and the internal commuter travel between cities and towns along the line. The line starts at Kongpu Station in Jiangbei District and ends at Cixi High-speed Railway Station. It passes through the new Ningbo North, Zhenhai, Longshan, Zhangqi, Guanhaiwei, Fuhai and Kandun, and connects with the subwaytwoLinefiveLinethreeLinesevenTransfer to Line No. The total length of the line is aboutsixty-fourKm, the length of underground line is about1seven.fiveKm, with 12 stations, with an average distance of aboutsixKm, including underground stationsfiveAll are transfer stations. One depot is set at the north end of Cixi high-speed railway station and one parking lot is set at Longshan.


The Group and Sinohydro Bureau 11 Co., Ltd. formed a consortium to win the bidSGCX0threeLot construction project, including Xincheng Avenue Station(Excluding)-Open cut section and section bridge of University Town Station, University Town Station, University Town Station-Double attached station(Excluding)Civil and structural works and electromechanical installation of section bridges(Excluding系統(tǒng)工程)Cooperate with decoration works, rainwater and sewage pipe relocation and other pipeline relocation, road restoration, sound barrier and other supporting works. The company is responsible for completing the total output value as the leaderfive0%Construction content: the 11th Bureau of Water and Electricity is responsible forfive0%The total construction period is about four years, and it is planned totwo0two6It will be completed and opened to traffic at the end of the year.

In recent years, Longyuan Construction Group has deeply cultivated the main track of urban development and attached great importance to the development of Ningbo rail transit construction marketfourCivil works of LineTJfour01sevenSince the bid section (Dongqianhu Station), a total of five Ningbo rail transit projects have been awarded, with the bid winning amount oftwo6.sevensevenRMB100mn

In the new year, Longyuan Construction Group will seize the momentum and make further efforts to steadily promote the high-quality development of the enterprise.